CMS Awarded $11M Fuel Hydrant System at FedEx Indy Hub

BARGERSVILLE, IN – CMS Corporation (CMS), a leading mechanical construction firm, announced today that it has been awarded an $11.4 million turnkey contract with Walsh Construction Company (Walsh) to install a new extension of the aviation fuel hydrant system at the Federal Express (FedEx) Corporation’s Indianapolis Hub (INDH) at the Indianapolis International Airport in Indianapolis, IN.

Over a 2-year construction period, CMS will provide and install approximately 24,000 feet of 12-inch and 16-inch epoxy-lined and FBE-coated pipe, galvanic cathodic protection (CP) for the piping and related structures, 35 fuel hydrant pits, 19 large isolation pits, 22 low point drain pits, and 22 high point vent pits. Work also includes approximately 1,500 feet of directional boring for a section of the 16-inch hydrant piping to be placed beneath 2 active taxiways and a runway. The complete fueling system includes installation of all related pipes, pits, valves, appurtenances, and static ground and CP systems.

This project is part of a 7-year, $1.5 billion expansion of FedEx’s 320-acre, 2.5 million-square-foot Indianapolis hub. All in, CMS’s portion of this project accounts for $11.4 million injected directly into the US and local economies through the purchase of domestically-made steel pipe, as well as the use of domestically-made specialty underground structures, domestic material suppliers, Indiana-based contractors (including MBEs), and locally-sourced labor. CMS is a Minority Business Enterprise (MBE) and Small Business headquartered in Bargersville, IN.

Ernest Enrique, CEO of CMS, stated, “CMS is known for performing complex industrial mechanical and fuels-related work for our DoD and commercial clients. This award, the result of a strategic collaboration with Walsh, allows us to showcase our mechanical self-performance capabilities building a pressurized aviation hydrant fuel system for a key commercial customer.”

RM Builders Wins $95M USACE Kansas City MATOC

MAUMEE, OH – CMS Corporation (CMS), under a joint venture arrangement with Jack Wayte Construction (JWC) called RM Builders, has been awarded a $95 million Multiple Award Task Order Contract (MATOC) with USACE Kansas City District. (JWC, an 8(a), WOSB, and EDWOSB, is a protégé to CMS, the mentor, under an SBA-approved Mentor-Protégé Agreement.) This contract is 100% set-aside for Small Business, with a 3-year ordering period and task orders valued up to $15 million. Task orders will be design-build (D-B) or design-bid-build (DBB) for a broad range of military construction and renovation work within the geographic boundaries of the Kansas City District, but may also be used to support other projects located within the larger Northwestern Division of USACE. Scopes of work may include construction of new facilities, renovation, general interior finish upgrades and space reconfiguration, electrical service improvements, roofing materials replacement, mechanical systems repair, storm drainage structure repair, and plumbing repairs and improvements. Facilities worked at may include industrial, distribution, manufacturing, office, retail, recreational, healthcare, residential, and commercial use.

There was tremendous competition for this contract. USACE received 40 proposals. RM Builders is one of only six firms awarded a contract. The estimated contract completion is January 2022. USACE Kansas City is the contracting agency.

CMS Projects Receive ABC Award of Excellence

MAUMEE, OH — The Associated Builders and Contractors (ABC) of Indiana/Kentucky recently awarded CMS Corporation (CMS) the 2018 Award of Excellence for projects at Purdue University, IN and Detroit Arsenal, Warren, MI. The Purdue Flex Lab Facility project received the Award of Excellence in Construction in the “Mechanical/ Commercial” category and the Detroit Arsenal Tank Command (TACOM) Miscellaneous Repairs, Building 230 in the “Federal Government/Military/Under $10M” category.

For the Purdue Flex Lab Facility, CMS performed mechanical scopes of work, including campus-wide systems integration, for the construction of a new 107,800-SF multidisciplinary engineering research building. As the prime mechanical subcontractor for this $54M state-of-the-art facility, CMS met the prime contractor’s mechanical requirements and expectations for constructability, design, function, operation, and life span. Work on the new facility began in 2016 and was completed in the fall of 2018. CMS self-performed over half the mechanical scope and also managed specialized mechanical contractors for quality, timeliness, and professional conduct.

As the prime contractor for the $3.6M design-build renovation of Building 230 at Detroit Arsenal, CMS reconfigured existing spaces to provide 200 work stations, 35 new offices, 4 copier/filing areas, 2 conference/team rooms, and a kitchenette/break room. CMS also upgraded the existing HVAC system and installed furnishings. Overall, CMS delivered an aesthetically pleasing, comfortable space for Army personnel that was in like-new condition, durable, maintainable, and sustainable. All work integrated seamlessly with the Arsenal’s other buildings and finishes.

The Award of Excellence honors the skill and creativity of project teams, including the contractor, owner, architect, and engineer, responsible for outstanding merit shop construction projects. CMS was recognized by ABC for excelling in innovation, quality, and safety on both projects.

Khush Mander, Executive Vice President, was on hand with other members of CMS to accept both awards at the ABC 2018 Merit Shop Construction Awards Gala on September 27, 2018 at the Crowne Plaza in downtown Indianapolis, IN.

CMS Welcomes William Beach as Vice President of Business Development

BARGERSVILLE, IN – CMS proudly announces William (Bill) Beach as our Vice President of Mechanical Business Development. Bill previously held executive level business development positions with successful companies such as American DG Energy, Pixel Velocity, and Integral Technologies and Andover Controls (both divisions of Schneider Electric). In addition to his experience in mechanical sales and marketing (CHP, chillers, boilers, heat pumps, and other commercial HVAC systems) to commercial clients, he is also knowledgeable in high definition video surveillance and perimeter protection systems, security management, fire alarm systems, and integrated enterprise facility systems. Mr. Beach has worked extensively throughout the U.S. and abroad (e.g., Pacific, South America, and Europe). 

Ernest Enrique, CEO, stated, “Bill brings over 30 years of hands-on business development and sales experience in the mechanical and energy sectors. His experience and drive is a great fit for the CMS Team. I look forward to working with him to expand our customer base and enhance our resume in the HVAC, mechanical, and energy markets throughout the US and beyond.” 

Mr. Beach holds a Master of Mechanical Engineering degree from Texas A & M University, as well as a Bachelor of Science in Mechanical Engineering from Pennsylvania State University. He will work out of the CMS Bargersville, IN office.