
Repair HVAC and Electrical Systems
Location: Camp Atterbury, Edinburgh, IN
Client: US Army Corps of Engineers
Completion: 2012
Value: $2.7M
Highlights:
- Received letter of commendation, and Outstanding and Exceptional performance ratings from the client.
Efficiency Upgrades
The CMS project team incorporated a number of sustainable features to minimize the energy consumption of the facility, conserve resources, minimize adverse effects on the environment, and improve occupant productivity, health, and comfort. These features included:
- High efficiency boilers
- Direct digital controls
- HVAC re-zoning
- Energy efficient interior lighting fixtures
- Water-saving plumbing fixtures
Scope
CMS replaced outdated boiler with three energy-saving, high efficiency boilers. Work also included repairs to the electrical distribution, lighting, and fire detection systems; installation of additional power and communications wiring; and renovations to interior finishes. The project also included lead abatement, removal of asbestos containing material, and removal of equipment containing mercury and PCBs.