Our quality control process is documented throughout each project and based upon a Quality Control Plan  specifically tailored to each scope of work. We follow the Three Phases of Control for each military project and implement similarstringent quality control procedures for work on non-military projects.

On traditional design-bid-build projects, our on-site quality control staff oversees and monitors field  performance to ensure all work is compliant with approved plans, engineering specifications, building codes,  and quality and schedule requirements. Inspections and tests are performed and documented on quality  control reports. We also oversee equipment and materials to determine their acceptability in  relation to the project’s definable features of work. When working within a design-build project delivery system, our full  service engineering design team also works to ensure that every design meets applicable codes, standards and  regulations as part of our Design Quality Control Plan.

RECENT CMS QUALITY AWARDS

D-B Renovation of Building F-30070, Wright-Patterson AFB, OH

  • Award of Excellence in Construction, Associated Builders and Contractors (ABC), 2014

D-B Combat Communication Support Facility and Transmission System Facility, Andersen AFB, Guam

  • Award of Excellence in Construction, ABC, 2014

Trident Refit Facility Dry Dock, Kings Bay, GA

  •  Award of Excellence in Construction, ABC, 2013

D-B Port Operations Waterfront Facility, Blount Island, FL

  • Award of Excellence in Construction, ABC, 2013

D-B Combat Support Vehicle Maintenance Facility, Andersen AFB, Guam

  • Excellence in Construction ($10-$100M category), Guam Contractors Assn (GCA), 2012
  • Excellence in Construction Design-Build Award, GCA, 2012
  • Award of Excellence, ABC, 2012